BLD-Final | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | DEFR |
Jim Storey
|
|
|
Zack Phone #: ###-#### out of time
|
BLD-Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | P | FAIL |
Jim Sly
|
|
|
Zack Phone #: ###-#### C/N.....C02 det (3) Steps at House ...Garage door.
|
BLD-Final | 5/2/2016 | 5/3/2016 | 5/3/2016 | P | NR |
Dave Hannah
|
|
|
Zack Phone #: ###-#### needs mec final
|
BLD-Energy code compliance | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2015 | 12/9/2015 | 12/9/2015 | A | PART |
Tony Young
|
|
|
Zack Phone #: ###-####,, correction posted,, ok to insulate
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | NR |
Tony Young
|
|
|
Zack Phone #: ###-####,, needs mech pass 1st
|
BLD-Framing/Rough-in | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | CANC |
Tony Young
|
|
|
Zack Phone #: ###-####
|
BLD-Wall Bracing | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Phil Shearer
|
|
|
Zack Phone #: ###-####
|
BLD-Foundation | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PASS |
Tony Young
|
|
|
stem wall; Zach Phone #: ###-####
|
BLD-Footing | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, unable to verify set backs
|