BLD-Final | 3/7/2018 | 3/8/2018 | 3/7/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 2/28/2018 | 3/1/2018 | 3/2/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for this permit complete.
|
BLD-Final | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PART |
Dave Hannah
|
|
|
floor 3-7 // ok for tem occ on 3rd and 4th floors
|
FIRE-Final Inspection | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PART |
Jim Page
|
|
|
Previously noted items for phase 4 TCO have been addressed/repaired, life fire safey inspection for phase 4 TCO complete.
|
FIRE-Final Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO requested areas for phase 3 complete.
|
BLD-Final | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PART |
Jim Page
|
|
|
Fire spinkler inspection for levels 5, 6 and 7 complete, fire alarm testing for levels 5, 6 and 7 complete, fire extinguishers are in place with current inspection tags on levels 5, 6 and 7. Generator transfer for emergency lighting has been tested and complete. Exterior signage for roof top access still needs to be installed as well as discussed signage for apartment units and common areas. Stairwell pressurization to be completed at a later date.
|
BLD-Final | 1/25/2018 | 1/26/2018 | 1/29/2018 | P | PEND |
Dave Hannah
|
|
|
Level 5-7 // Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | CANC |
Jim Page
|
|
|
Inspection request for life fire safety TCO will be rescheduled for 29JAN2018.
|
BLD-Final | 1/19/2018 | 1/23/2018 | 1/23/2018 | P | PEND |
Dave Hannah
|
|
|
Jason-floors 6 and 7 Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | CANC |
Jim Page
|
|
|
Issues with fire alarm on level 6, more testing needs to be completed before TCO, this request is cancelled.
|
FIRE-Final Inspection | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | CANC |
Jim Page
|
|
|
Due to inspection load, this inspection will be rescheduled by Jason Phone #: ###-#### for 9AM, this request is cancelled.
|
BLD-Conference | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PART |
Dave Hannah
|
|
|
3rd floor- Monty Phone #: ###-####west side drop ceilings ok
|
BLD-Ceiling Grid Inspection | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Dave Hannah
|
|
|
All of level 4 ceiling inspection at drop lids in units and common area corridors for drywall cover. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Framing/Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Dave Hannah
|
|
|
Monty Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | NR |
Dave Hannah
|
|
|
Monty Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower B Shaft walls and 6th Floor Drop Ceiling Framing. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower A shafts at 3rd and 4th floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall cover | 8/21/2017 | 8/23/2017 | 8/24/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower A Shafts at 3rd and 4th floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall cover | 8/16/2017 | 8/18/2017 | 8/23/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower A 6th floor shafts Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall cover | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower A, 7th Floor Shaft Walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Fire Caulking at the 5th Floor of Tower A. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PART |
Dave Hannah
|
|
|
Inspection request for Tower A, 5th floor Fire Caulking. Consultation regarding Hollow Metal Door Frame grout or fire rated spray foam. Phone #: ###-#### Inspection requested via web by Carl Benjamin needs to install callorson larger pipes
|
BLD-Wall cover | 6/30/2017 | 7/3/2017 | 7/3/2017 | A | PART |
Mike Jordan
|
|
|
Inspection request for 2hr Rated Shaft assemblies at Tower A. Please contact Monty when you arrive at site. Need to sign the inspection book for the Insulation cover at 2nd floor and 5th floor Tower B. Thank you Dave. Phone #: ###-#### Inspection requested via web by Carl Benjamin. A wing shafts, 3rd. floor to roof, interior portions only.
|
BLD-Energy code compliance | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the 2nd floor insulation Phone #: ###-#### Inspection requested via web by Carl Benjamin also insulation on 5th floor bwing
|
BLD-Energy code compliance | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the 5th floor Tower B. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PART |
Brandon Shaw
|
|
|
Tower B, Floors 3 thru 7 Corridor Insulation and Barriers.
|
BLD-Energy code compliance | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Dave Hannah
|
|
|
Insulation Inspection for the 7th floor. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 6/12/2017 | 6/13/2017 | 6/13/2017 | A | PASS |
Dave Hannah
|
|
|
Energy code for units 601, 602, and 605. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 6/9/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/9/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for 6th floor Tower A Insulation and Barrier. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall cover | 6/2/2017 | 6/5/2017 | 6/6/2017 | A | PART |
Dave Hannah
|
|
|
Fire Caulking and cover Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 5/26/2017 | 5/30/2017 | 5/30/2017 | A | NR |
Dave Hannah
|
|
|
6th floor - Carl Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### 6th floor hall area a ok to cover
|
BLD-Aging Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the sheeting at the 2 hour separation walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | DONE |
Mike Jordan
|
|
|
Framing for the 3rd floor. Phone #: ###-#### Inspection requested via web by Carl Benjamin. Went over rated construction with contractor.
|