BLD-Final | 5/17/2016 | 5/18/2016 | 5/18/2016 | P | PASS |
Jim Sly
|
|
|
Lloyd Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ. OK for Perm Occ when Public Work signs for final OK. Yes, they signed card ........Did not put in computer ........and then when I called them, they said it was only Temp. ??
|
BLD-Final | 3/24/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Jim Sly
|
|
|
Carlos Phone #: ###-####
|
FIRE-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Energy code compliance | 1/8/2016 | 1/11/2016 | 1/11/2016 | A | PASS |
Jim Sly
|
|
|
Loyyd Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2016 | 1/7/2016 | 1/8/2016 | P | PASS |
Jim Sly
|
|
|
Loyyd Phone #: ###-####
|
BLD-Wall Bracing | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | PART |
Jim Sly
|
|
|
Lloyd Phone #: ###-#### Exterior shear nailing only....OK. Need nuts on HDs
|
BLD-Framing/Rough-in | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | CANC |
Jim Sly
|
|
|
Llyod Phone #: ###-####
|
BLD-Foundation | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Jim Sly
|
|
|
Llyod Phone #: ###-####// plan to pour 11am Pending MTI special insp, tests and approvals.
|
BLD-Foundation | 11/25/2015 | 11/30/2015 | 11/30/2015 | A | CANC |
Jim Sly
|
|
|
Lloyd Phone #: ###-#### Not going to pour due to 17 degree weather.
|
BLD-Foundation | 11/19/2015 | 11/23/2015 | 11/23/2015 | A | PART |
Jim Sly
|
|
|
Llyod Phone #: ###-#### WIP .......Verified with Structural Engineer .....Special insp required. Footing OK pending special insp, tests and approvals.
|