BLD-Final | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Jim Sly
|
|
|
Call for access code - Alan Phone #: ###-####
|
DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Jim Sly
|
|
|
Alan Phone #: ###-#### Framing and Shear pass.
|
BLD-Foundation | 1/5/2016 | 1/5/2016 | 1/6/2016 | P | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-####
|
BLD-Footing | 12/30/2015 | 12/31/2015 | 1/1/2016 | A | PASS |
Jim Sly
|
|
|
Jake-pour time 12:30-please call with an approx meet time Phone #: ###-#### Not pouring til Mon......When temp, is better. Told him to cover with 2 layers of blankets for Min. 48 hrs.
|