BLD-Final | 11/23/2015 | 11/24/2015 | 11/24/2015 | A | PASS |
Phil Shearer
|
|
|
Tim-please call prior to meet Phone #: ###-####
|
FIRE-Final Inspection | 11/20/2015 | 11/23/2015 | 11/23/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Tim and I discussed him getting an updated plan to plan review prior to a building inspection showing the minor wall differences at the Reception Area.
|
BLD-Final | 11/5/2015 | 11/9/2015 | 11/9/2015 | P | NR |
Jim Sly
|
|
|
would like call ahead; Tim Phone #: ###-#### Need fire final.
|
FIRE-Final Inspection | 11/5/2015 | 11/9/2015 | 11/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes, provide fire extinguisher as discussed, remove thumbturn dead bolt at main exit (keyed is ok), remove round knob at main exit and provide single action lever type, provide sticker at main exit as discussed.
|