BLD-Final | 2/8/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
Mount and tag fire extinguishers as shown on the plans, provide sticker at the Room 100 exit door, provide ADA single action hardware on the warehouse store front door, provide ADA single action hardware on Office 101 door, repaire emergency light in warehouse.
|
BLD-Framing/Rough-in | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2016 | 2/3/2016 | 2/3/2016 | A | PEND |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Contractor noted that 3m product used for membrane and through penetration protection. Need UL data to verify instalation.
|
BLD-Framing/Rough-in | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. All isues have been resolved. ok to cover.
|
BLD-Conference | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | DONE |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | FAIL |
Jim Storey
|
|
|
Scott Phone #: ###-#### /n isuedc
|
BLD-Framing/Rough-in | 1/20/2016 | 1/20/2016 | 1/20/2016 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Architect to provide additional framing details for 3hr. fire barrier wall from bottom chord of roof joist to underside of steel deck.. Also provide Approved listed through penetration protection for steel beam, electrical conduits and copper water line.
|