BLD-Final | 10/4/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Jim Page
|
|
|
Fire department inspection is complete, this was the final item for life fire safety, final life fire safety inspection passed/complete.
|
BLD-Final | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PART |
Jim Sly
|
|
|
Late morning, after PLM - Dave Phone #: ###-#### OK for Temp. Occ. OK for Perm Occ when Fire Dept. approves Fuel/pump Emergency shut offs ........and Fire/life safety signs off for Perm. Occ.
|
FIRE-Final Inspection | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Jim Page
|
|
|
Partial final inspection for life safety complete, fire department inspection still needs to happen for the fuel pumps/emergency shutoff. No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Life fire safety can be signed off as complete after the fire department inspection for the fuel tanks/pumps is passed and complete.
|
BLD-Final | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | NR |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 8/31/2016 | 9/1/2016 | 9/1/2016 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####roof insulation ok to cover
|
BLD-Energy code compliance | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Jim Storey
|
|
|
Dave// ###-####-- inspection for the exterior walls hold downs and sheer ok to cover.
|
BLD-Framing/Rough-in | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | DEFR |
Jim Storey
|
|
|
Dave// ###-####-- inspection for the exterior walls out of time
|
BLD-Framing/Rough-in | 7/29/2016 | 8/1/2016 | 8/1/2016 | P | CANC |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | DONE |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Other | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | CANC |
Jim Sly
|
|
|
John-roof drain Phone #: ###-#### Called in by mistake.
|
BLD-Foundation | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Foundation | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Storey
|
|
|
Dave-- ###-####
|
BLD-Footing | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### si pending
|
BLD-Foundation | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | NR |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Foundation | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Jim Storey
|
|
|
Rebar // Dave Phone #: ###-####
|
BLD-Foundation | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | CANC |
Jim Storey
|
|
|
Rebar // Dave Phone #: ###-####
|
BLD-Foundation | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Jim Storey
|
|
|
rebar Phone #: ###-#### si ok
|