BLD-Final | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | PASS |
Dave Hannah
|
|
|
Rob-please let Rob know if an extension for the temp c of o needs to be requested Phone #: ###-####
|
DOC - Permit Finaled | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PEND |
Mike Jordan
|
|
|
Austin-please ask for the rest manager or call Austin-need final for perm c of o Phone #: ###-####. Will rescheduke for monday.
|
BLD-Aging Inspection | 1/25/2017 | 1/25/2017 | 1/27/2017 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Jim Page
|
|
|
Final Fire inspection complete
|
BLD-Final | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### ok to ext temp
|
BLD-Conference | 8/22/2016 | 8/23/2016 | 8/24/2016 | A | PASS |
Dave Hannah
|
|
|
In writing conditional temp CofO // Austin Phone #: ###-#### ok for tcofor public
|
BLD-Final | 8/9/2016 | 8/10/2016 | 8/11/2016 | P | PART |
Dave Hannah
|
|
|
Rod Phone #: ###-#### ok for temp ok to stock and train only thing holding ok to open is exiting outside of building
|
FIRE-Final Inspection | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for this tenant space complete, final fire alarm for this tenant space complete, final inspection for commercial hood suppression system complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 7/7/2016 | 7/7/2016 | 7/8/2016 | P | PASS |
Dave Hannah
|
|
|
Kitchen area - Rod Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PART |
Mike Jordan
|
|
|
Rod-kitchen Phone #: ###-####. Grid in kitchen ok. still needs MEP inspections.
|
BLD-Conference | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | DONE |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2016 | 4/25/2016 | 4/28/2016 | P | PASS |
Dave Hannah
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 4/8/2016 | 4/8/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
Rod also has electrical and plumbing inspections scheduled for the PM. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2016 | 3/18/2016 | 3/21/2016 | P | PART |
Dave Hannah
|
|
|
Rod Phone #: ###-#### fire wall between tenent spaces ok
|