Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD15-04521
StatusFinaled
Name HC COMPANY INC
Site Address 627 N DUPONT AVE 102
Project NameMountainland Design
Customer NumberBLD16-00344 EARLY START
ePlanReviewYes
Description
(MOUNTAINLAND DESIGN) PLAN MODIFICATION TO INCLUDE ELECTRICAL, PLUMBING AND MECHANICAL WORK. Permit for tenant improvements to an existing 11,407 sq. ft. tenant space with work to include the removal of interior nonbearing partition walls, construction of new interior nonbearing and bearing walls to create a new mezzanine, offices, showroom areas and three new accessible restrooms per the approved plans and the attached engineering. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/201611/4/201611/4/2016PPASS
DetailsMike Jordan
Mark Phone #: ###-####. Wll be ok for perm occ. once plumbing signs perm.
FIRE-Final Inspection11/1/201611/1/201611/1/2016PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final10/18/201610/19/201610/19/2016APART
DetailsMike Jordan
Mark Phone #: ###-####. OK for temp occ. Needs to provide ADA compliant door hardware on restrooms, provide flusher on turning side in womens restroom, and install boots underneath the lavs. The door hardware on door between showroom and warehouse can be left as installed. Needs to provide code compliant door hardware to exit frfom vestibule doors to exterior without the use of key or special hardware.
FIRE-Final Inspection10/18/201610/19/201610/19/2016APART
DetailsTroy Cobbley
A temporary for fire life safety is ok with Scotts permission until ADA single action hardware is provided for the mezzanine Server Room, first floor Restrooms and the doors that separate the Showroom from the Warehouse.
FIRE-Final Inspection10/17/201610/18/201610/18/2016AFAIL
DetailsTroy Cobbley
Provide ADA compliant hardware for the restrooms and second floor server room. Provide annual inspection for the fire extinguishers.
BLD-Ceiling Grid Inspection9/28/20169/28/20169/28/2016PPASS
DetailsMike Jordan
Ken Phone #: ###-####. Grid ok upsatirs and downstairs.
BLD-Wall cover7/12/20167/13/20167/13/2016APASS
DetailsJim Sly
Cloud cover inspection. 1st thing am if possible.
Thank you. Phone #: ###-#### Inspection requested via web by Ken Heyne
BLD-Energy code compliance6/22/20166/23/20166/23/2016APASS
DetailsMike Jordan
Upper mezzanine exterior wall insulation. AM please. Phone #: ###-#### Inspection requested via web by Ken Heyne
BLD-Framing/Rough-in6/20/20166/21/20166/21/2016APASS
DetailsMike Jordan
Mezzanine framing, floor diaphragm. Phone #: ###-#### Inspection requested via web by Ken Heyne.
BLD-Wall Bracing6/16/20166/16/20166/16/2016PPASS
DetailsMike Jordan
Ken-shear wall screw Phone #: ###-####. INteior gypsum board shear walls ok.
BLD-Framing/Rough-in6/10/20166/13/20166/13/2016APASS
DetailsMike Jordan
Ken Phone #: ###-####. INterior steel stud framed walls, hardlids and soffits for restroom, and showroom.
BLD-Ceiling Grid Inspection6/9/20166/10/20166/10/2016APASS
DetailsMike Jordan
Ken Phone #: ###-####. Blocking onstalled. Ok to rock ares under mezz.
BLD-Ceiling Grid Inspection6/8/20166/9/20166/9/2016APART
DetailsMike Jordan
Ken Phone #: ###-####. Mezzanine framing. Needs to provide the additional blocking at 24 inches on center as per the approved plans and detail. ok to start sheet rocking this area. Will reinspect areas with the blocking prior to cover.
BLD-Energy code compliance6/9/20166/9/20166/9/2016APASS
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Conference6/7/20166/7/20166/8/2016PPASS
DetailsMike Jordan
Conference with Super to discuss whether or not it is ok to rock/insulate from Roof Deck down at the demising wall due to construction constraints. Ken Heyne is the onsite Super and his number is above. Phone #: ###-#### Inspection requested via web by Jeremy Barber
BLD-Framing/Rough-in6/2/20166/2/20166/2/2016APASS
DetailsMike Jordan
Request framing inspection for North ; East perimeter walls
If possible please call when on the way so Supt can be sure to be on site for inspection. Thanks. Gary Band ###-#### Phone #: ###-#### Inspection requested via web by Gary Band. East furred wall from mezz. to main enterance ok to insulate.
BLD-Framing/Rough-in5/31/20166/1/20166/1/2016PPART
DetailsMike Jordan
Framing inspection for area under mezzanine and up to entry door. Phone #: ###-#### Inspection requested via web by Jeremy Barber. General walk through with contractor. Still needs fire sprinkler rough in. Will call in another framing inspection inspection prior to cover.
BLD-Conference5/6/20165/9/20165/9/2016ADONE
DetailsMike Jordan
If possible please call when en route so I can be sure to be on site. Thank you Phone #: ###-#### Inspection requested via web by Gary Band. Discussed the possibilty of one siding the demissing wall up top. Appears no electrical, but noted to contractor to check with electrical inspector prior to proceeding.
BLD-Conference4/12/20164/13/20164/13/2016ADONE
DetailsMike Jordan
Please call 15 minutes or so before Phone #: ###-#### Inspection requested via web by Gary Band