BLD-Final | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Wll be ok for perm occ. once plumbing signs perm.
|
FIRE-Final Inspection | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PART |
Mike Jordan
|
|
|
Mark Phone #: ###-####. OK for temp occ. Needs to provide ADA compliant door hardware on restrooms, provide flusher on turning side in womens restroom, and install boots underneath the lavs. The door hardware on door between showroom and warehouse can be left as installed. Needs to provide code compliant door hardware to exit frfom vestibule doors to exterior without the use of key or special hardware.
|
FIRE-Final Inspection | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PART |
Troy Cobbley
|
|
|
A temporary for fire life safety is ok with Scotts permission until ADA single action hardware is provided for the mezzanine Server Room, first floor Restrooms and the doors that separate the Showroom from the Warehouse.
|
FIRE-Final Inspection | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide ADA compliant hardware for the restrooms and second floor server room. Provide annual inspection for the fire extinguishers.
|
BLD-Ceiling Grid Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Grid ok upsatirs and downstairs.
|
BLD-Wall cover | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Jim Sly
|
|
|
Cloud cover inspection. 1st thing am if possible. Thank you. Phone #: ###-#### Inspection requested via web by Ken Heyne
|
BLD-Energy code compliance | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Mike Jordan
|
|
|
Upper mezzanine exterior wall insulation. AM please. Phone #: ###-#### Inspection requested via web by Ken Heyne
|
BLD-Framing/Rough-in | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Mike Jordan
|
|
|
Mezzanine framing, floor diaphragm. Phone #: ###-#### Inspection requested via web by Ken Heyne.
|
BLD-Wall Bracing | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Mike Jordan
|
|
|
Ken-shear wall screw Phone #: ###-####. INteior gypsum board shear walls ok.
|
BLD-Framing/Rough-in | 6/10/2016 | 6/13/2016 | 6/13/2016 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. INterior steel stud framed walls, hardlids and soffits for restroom, and showroom.
|
BLD-Ceiling Grid Inspection | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Blocking onstalled. Ok to rock ares under mezz.
|
BLD-Ceiling Grid Inspection | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PART |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Mezzanine framing. Needs to provide the additional blocking at 24 inches on center as per the approved plans and detail. ok to start sheet rocking this area. Will reinspect areas with the blocking prior to cover.
|
BLD-Energy code compliance | 6/9/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####
|
BLD-Conference | 6/7/2016 | 6/7/2016 | 6/8/2016 | P | PASS |
Mike Jordan
|
|
|
Conference with Super to discuss whether or not it is ok to rock/insulate from Roof Deck down at the demising wall due to construction constraints. Ken Heyne is the onsite Super and his number is above. Phone #: ###-#### Inspection requested via web by Jeremy Barber
|
BLD-Framing/Rough-in | 6/2/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Mike Jordan
|
|
|
Request framing inspection for North ; East perimeter walls If possible please call when on the way so Supt can be sure to be on site for inspection. Thanks. Gary Band ###-#### Phone #: ###-#### Inspection requested via web by Gary Band. East furred wall from mezz. to main enterance ok to insulate.
|
BLD-Framing/Rough-in | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | PART |
Mike Jordan
|
|
|
Framing inspection for area under mezzanine and up to entry door. Phone #: ###-#### Inspection requested via web by Jeremy Barber. General walk through with contractor. Still needs fire sprinkler rough in. Will call in another framing inspection inspection prior to cover.
|
BLD-Conference | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | DONE |
Mike Jordan
|
|
|
If possible please call when en route so I can be sure to be on site. Thank you Phone #: ###-#### Inspection requested via web by Gary Band. Discussed the possibilty of one siding the demissing wall up top. Appears no electrical, but noted to contractor to check with electrical inspector prior to proceeding.
|
BLD-Conference | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | DONE |
Mike Jordan
|
|
|
Please call 15 minutes or so before Phone #: ###-#### Inspection requested via web by Gary Band
|