BLD-Final | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
FIRE-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete (FIR number not attached to project, FIR16-00084), final fire alarm inspection complete (FIR16-00185), fire extinguishers are mounted in common area's with current inspection tags. Final life fire safety inspection for area of work passed/complete.
|
BLD-Conference | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | CANC |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Final | 7/18/2016 | 7/19/2016 | 7/19/2016 | P | NR |
Dave Hannah
|
|
|
Please feel free to call Joel at ###-#### for any questions. If Joel needs to be on site please call 30 minutes in advance. Phone #: ###-#### Inspection requested via web by Joel Stobie
|
BLD-Final | 6/20/2016 | 6/21/2016 | 6/27/2016 | P | DONE |
Dave Hannah
|
|
|
Request temp occupancy for privacy rooms in Southwest corner of 2nd floor. Fire/life safety inspection scheduled for 6/21 as well. Phone #: ###-#### Inspection requested via web by Joel Stobie
|
BLD-Final | 6/23/2016 | 6/23/2016 | 6/27/2016 | A | PART |
Dave Hannah
|
|
|
Request temp occupancy for privacy rooms in Southwest corner of 2nd floor. Fire/life safety inspection scheduled for 6/21 as well. Phone #: ###-#### Inspection requested via web by Joel Stobie ok to use rooms
|
FIRE-Conference | 6/22/2016 | 6/22/2016 | 6/22/2016 | A | DONE |
Katie Marron
|
|
|
Fire Sprinkler Permit is not linked to BLD. Ensure FIR16-00084 is signed off before finaling
|
BLD-Framing/Rough-in | 4/11/2016 | 4/11/2016 | 4/11/2016 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|