BLD-Final | 6/1/2016 | 6/3/2016 | 6/3/2016 | A | PASS |
Dave Hannah
|
|
|
Danny Phone #: ###-####
|
BLD-Conference | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | NR |
Dave Hannah
|
|
|
As early as possible Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins
|
BLD-Final | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PEND |
Dave Hannah
|
|
|
ok for temp need to see final set up and sales counters clean out area in basement not for use get finals on other trades
|
BLD-Other | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Dave Hannah
|
|
|
Danny Phone #: ###-####
|
FIRE-Final Inspection | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, storage height is not to exceed 8 feet unless a racking permit is requested/inspected and approved. Final life fire safety inspection passed/complete.
|
BLD-Conference | 5/18/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Jim Storey
|
|
|
would like call ahead; Danny Phone #: ###-#### blade sign mounting engineering instaled
|
BLD-Framing/Rough-in | 5/5/2016 | 5/5/2016 | 5/6/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### corrador basement ok to cover
|
BLD-Foundation | 4/19/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2016 | 4/18/2016 | 4/19/2016 | P | PASS |
Dave Hannah
|
|
|
Danny Phone #: ###-#### hardlid ceiling ok to cover
|
BLD-Framing/Rough-in | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PASS |
Dave Hannah
|
|
|
Danny Phone #: ###-#### ok to cover walls and bathrooms
|