BLD-Final | 3/30/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Mike Jordan
|
|
|
Please call for access Phone #: ###-#### Inspection requested via web by matthew greenman
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Alarm Testing | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PASS |
Troy Cobbley
|
|
|
Smoke evac test passed
|
BLD-Conference | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | CANC |
Mike Jordan
|
|
|
Drywall screw pattern inspect requested by Mike Phone #: ###-#### Inspection requested via web by matthew greenman. 1hr. partition ok.
|
FIRE-Alarm Testing | 2/4/2016 | 2/4/2016 | 2/4/2016 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow
|
FIRE-Conference | 2/2/2016 | 2/3/2016 | 2/3/2016 | A | DONE |
Troy Cobbley
|
|
|
Phone #: ###-#### Matthew greenman and I spoke about the new wall and how the existing fire sprinkler system and smoke evac system will need to be modified so that coverage is maintained on both sides of the wall. They do have an option of getting approval from Scott if an agreement in writing is reached since new tenants are moving in on both sides of this wall and their construction is to begin soon.
|
BLD-Framing/Rough-in | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Mike Jordan
|
|
|
Please call for access Thanks Phone #: ###-#### Inspection requested via web by matthew greenman
|