BLD-Final | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Mike Jordan
|
|
|
Late morning if possible Phone #: ###-#### Inspection requested via web by Darius Saxton. Okfor perm occ.
|
FIRE-Final Inspection | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Ceiling Grid Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
BLD-Final | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PART |
Mike Jordan
|
|
|
Call Brad onsite at ###-####. Phone #: ###-#### Inspection requested via web by Darius Saxton. Phase 1 ok to occupy.
|
BLD-Final | 5/27/2016 | 5/27/2016 | 5/27/2016 | A | NH |
Dave Hannah
|
|
|
Late morning would be best. Life safety inspection being scheduled for a.m. also. Phone #: ###-#### Inspection requested via web by Darius Saxton I called but no one anwsered or called back
|
FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Troy Cobbley
|
|
|
Life safety for phase 1 passed
|
FIRE-Alarm Testing | 5/27/2016 | 5/27/2016 | 5/27/2016 | A | PART |
Troy Cobbley
|
|
|
Phase 1 life safety passed.
|
BLD-Ceiling Grid Inspection | 5/18/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
BLD-Ceiling Grid Inspection | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton. Provide clips or spreader bars in main area.
|
BLD-Framing/Rough-in | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton. Phase 1 interior steel stud walls and soffit ok.
|