Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD16-00295
StatusFinaled
Name TERRY LEIGHTON ENTERPRISES INC
Site Address 390 E PARKCENTER BLVD Unit: 100
Project NameBeto Financial Group Ste #100
Customer Number 
ePlanReviewYes
Description
(BETO FINANCIAL GROUP - Suite 100) Permit is to remodel an existing 2,827 sq. ft. tenant space within the 12,979 sq. t. first floor area. (Note: this was previously suite #130 and got changed at the request of the applicant and approved by addressing.) Approval is contingent upon adhering to the approved plans on file. Work to include: Removal of select interior nonbearing walls, removal of select millwork, new construction of interior non-bearing walls to create (5) new offices, a conference room, wall infill of select openings, modify existing reception desk and add accessible portion to desk, adding millwork to existing break room counter with a new dishwasher, relocate existing light fixtures, new electrical, electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/31/20164/1/20164/1/2016APASS
DetailsJim Storey
Terry Phone #: ###-####
FIRE-Final Inspection3/30/20163/30/20163/30/2016PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection3/10/20163/11/20163/11/2016APASS
DetailsJim Storey
Terry Phone #: ###-####
BLD-Framing/Rough-in2/18/20162/18/20162/18/2016PPART
DetailsJim Storey
Terry Phone #: ###-#### framing ok need 12 aproch rms7 & 8 check at final