Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-00591
StatusFinaled
Name BASE CONSTRUCTORS
Site Address 8279 W FRANKLIN RD
Project NameAT&T
Customer Number 
ePlanReviewYes
Description
** (AT&T) ** Permit is to remodel an existing 1,702 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: Removal of select interior nonbearing walls, removal of select suspended ceiling, removal of select millwork, removal of select light fixtures, construction of select interior nonbearing walls to demise the sales floor and the open office area, select furred out walls at sales area, new light fixtures, new acoustic suspended ceiling, electrical work, minor ductwork and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/1/20166/1/20166/1/2016PPASS
DetailsMike Jordan
Please call prior to arriving - fire final is doing reinspect for door hardware so trying to have you afterwards but either way can we be inspected incase we missed anything else to reinspect for tomorrow so they can open Phone #: ###-#### Inspection requested via web by Andrew George
DOC - Permit Finaled6/1/20166/1/20166/1/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection6/1/20166/2/20166/1/2016APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/1/20166/1/20166/1/2016PFAIL
DetailsTroy Cobbley
Still need the exterior hardware changed to single action. All of the other items have been corrected.
BLD-Conference5/27/20165/27/20165/27/2016PNR
DetailsDave Hannah
To be done after fire I sphave croon if possible Phone #: ###-#### Inspection requested via web by Andrew George
FIRE-Final Inspection5/27/20165/27/20165/27/2016PFAIL
DetailsTroy Cobbley
See the city approved plans for corrections noted that include removing the manual flush bolts from the inactive leaf of the main exit door and providing automatic flush bolts, removing the keyed deadbolt from the existing office exterior exit door, providing an exit light and emergency lighting above the exxterior exit door, and removing the two thumbturn deadbolts from the interior office doors. I discussed with the general contractor that the round knobs on the interior door may need to be replaced at the building inspector discression
BLD-Final5/27/20165/27/20165/27/2016ANR
DetailsDave Hannah
Key in lockbox on east side south door if locked. Phone #: ###-#### Inspection requested via web by Andrew George needs fire finals
BLD-Ceiling Grid Inspection5/20/20165/20/20165/20/2016PPART
DetailsMike Jordan
MIke, the Mech got done yesterday and the sprinklers are sched for this morn. So we should be good to go - sorry for the confusion. Phone #: ###-#### Inspection requested via web by Andrew George. Needs to clip all runners at perimeter.
BLD-Ceiling Grid Inspection5/19/20165/19/20165/19/2016ANR
DetailsMike Jordan
Mike, Can we get a partial inspection for the front sales area grid (large portion) as we are waiting for a light for the hallway back in the rear. We do have approval to cover from electrical on that section. Phone #: ###-#### Inspection requested via web by Andrew George. Still needs mech. and fire sprinkler rough in inspections.
BLD-Ceiling Grid Inspection5/9/20165/10/20165/10/2016PNR
DetailsMike Jordan
You may enter through south door on east side lock box on door - code 4480. Permit set plans on site . Phone #: ###-#### Inspection requested via web by Andrew George. Needs MEP rough ins.
BLD-Framing/Rough-in4/20/20164/21/20164/21/2016PPASS
DetailsMike Jordan
East door is access. If locked the lockbox is on handle to the temporary retail shop to the left of door to enter construction site. Code is 4480. Plans on site. If possible please call when enroute would like to meet you there to go over a few things. Thanks, Andrew Phone #: ###-#### Inspection requested via web by Andrew George. INterior steel stud framed walls ok.
BLD-Framing/Rough-in4/18/20164/18/20164/18/2016PCANC
DetailsMike Jordan
Lockbox on door to temp retail services on east side of bldg, entry to construction area to the right of retail area. Box code 4480. rough in framing inspection. Plans on site, Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
BLD-Framing/Rough-in4/15/20164/18/20164/18/2016ACANC
DetailsMike Jordan
entry on east side of space, lockbox code 4480 on retail door but key is for the construction area door to the right of lockbox. Plans on site. Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George