Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-00667
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 755 W FRONT ST Unit: 300
Project NameColliers International #300
Customer Number 
ePlanReviewYes
Description
** (COLLIERS INTERNATIONAL - BODO BLDG #7 – 3rd Floor Suite 300) ** This building is fire sprinklered for fire area and to allow the multitheater complex. Permit is to remodel an existing 10,368 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, remove select millwork, construction of new select interior nonbearing walls to create an office, two conference rooms and an open office area, electrical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20172/13/20172/13/2017APASS
DetailsDave Hannah
DOC - Permit Finaled2/13/20172/13/20172/13/2017PPASS
DetailsDave Hannah
BLD-Aging Inspection2/10/20172/10/20172/13/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection9/29/20169/29/20169/29/2016 PASS
DetailsDave Hannah
BLD-Final5/18/20165/18/20165/18/2016PPASS
DetailsDave Hannah
Garrett Phone #: ###-####
FIRE-Final Inspection5/13/20165/13/20165/13/2016PPASS
DetailsJim Page
Fire sprinker inspection complete (FIR16-00220), fire alarm inspection complete (FIR16-00195), fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection4/25/20164/26/20164/26/2016APASS
DetailsDave Hannah
would like call ahead; Jared Phone #: ###-####
BLD-Framing/Rough-in3/28/20163/28/20163/29/2016PPASS
DetailsDave Hannah
Please call 30min prior for access - Garrett Phone #: ###-####