BLD-Final | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
DOC - Permit Finaled | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/2/2016 | 6/3/2016 | 6/3/2016 | P | PART |
Tony Young
|
|
|
would like call ahead; Bruce Phone #: ###-####, stair forming,, work in progress,, ok,, existing sloped landing will be as close as possible, ok to pour when ready
|
BLD-Framing/Rough-in | 5/20/2016 | 5/23/2016 | 5/23/2016 | P | NR |
Tony Young
|
|
|
would like call ahead; Bruce Phone #: ###-####,, conf only,, engineer changed design,, ok
|