BLD-Energy code compliance | 4/27/2016 | 4/27/2016 | 4/28/2016 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 4/21/2016 | 4/21/2016 | 4/27/2016 | P | PASS |
Dave Hannah
|
|
|
After 2 // Bill Phone #: ###-####walls ok but needs to do ceiling
|
BLD-Energy code compliance | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | FAIL |
Dave Hannah
|
|
|
Bill-would like as early as possible Phone #: ###-#### walls not done and r30 in ceiling needs r38
|
BLD-Wall Bracing | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PASS |
Dave Hannah
|
|
|
Shear // Bill Phone #: ###-####
|
BLD-Footing | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|