BLD-Final | 4/25/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Mike Jordan
|
|
|
Mike, I called Meridian Plumbing after we talked and the final plumbing inspection is supposed to take place in the morning. I was hoping you could do the final-final in the afternoon. Thanks so much for your time Phone #: ###-#### Inspection requested via web by Dale Hinman
|
DOC - Permit Finaled | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | NR |
Mike Jordan
|
|
|
Had final inspection for phase 1 in Dec. Would like to schedule Final for phase 2 for tomorrow Tue 25th. Will ask for final electrical also. Phone #: ###-#### Inspection requested via web by Dale Hinman. Needs plumbing final.
|
BLD-Other | 12/4/2016 | 12/5/2016 | 12/5/2016 | P | PART |
Jim Sly
|
|
|
I would like to have the final inspection for phase 1 of the project (which was the new upstairs and downstairs) and the rough in inspection for the new ground floor. Thanks so much for your time. Phone #: ###-#### Inspection requested via web by Dale Hinman Framing on Main floor OK to cover pending Electr and Plumb R/I approvals.
|
BLD-Framing/Rough-in | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Mike Jordan
|
|
|
Dale Phone #: ###-####. Phase 1, west portion of remodel ok to cover pend. electrical rough in inspection.
|