BLD-Final | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Phil Shearer
|
|
|
Joshia Phone #: ###-####
|
DOC - Permit Finaled | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Framing/Rough-in | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Tony Young
|
|
|
Insulation // Josiah Phone #: ###-####
|
BLD-Energy code compliance | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Tony Young
|
|
|
Insulation // Josiah Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2016 | 5/23/2016 | 5/23/2016 | P | PART |
Tony Young
|
|
|
Josiah Phone #: ###-####,, ok to insulate,, need to verify seal pack,, connect new to existing,, need to make egress per code prior to final
|
BLD-Foundation | 4/22/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Tony Young
|
|
|
Josh-wall Phone #: ###-####
|
BLD-Conference | 4/21/2016 | 4/22/2016 | 4/24/2016 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
BLD-Footing | 4/21/2016 | 4/22/2016 | 4/24/2016 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|