BLD-Aging Inspection | 4/6/2017 | 4/6/2017 | 4/7/2017 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | | | 4/6/2017 | | DONE |
|
|
|
Final passed 11-23-16
|
BLD-Final | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Phil Shearer
|
|
|
Sam-please call for access Phone #: ###-####
|
BLD-Energy code compliance | 8/31/2016 | 9/1/2016 | 8/31/2016 | P | PASS |
Tony Young
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2016 | 8/30/2016 | 8/31/2016 | P | PASS |
Tony Young
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PART |
Tony Young
|
|
|
Sam Phone #: ###-####,, frame conf,, call 1st,, c/n posted,, ok to insulate
|
BLD-Conference | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | DEFR |
Tony Young
|
|
|
Sam Phone #: ###-####,, frame conf,, call 1st
|
BLD-Framing/Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | NR |
Tony Young
|
|
|
Sam Phone #: ###-####,, frame conf
|
BLD-Conference | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PART |
Tony Young
|
|
|
Sam Phone #: ###-####,, frame conf,, ok to put interior shear on around stairwell,, (insulation ok)
|
BLD-Framing/Rough-in | 8/18/2016 | 8/22/2016 | 8/22/2016 | A | NR |
Tony Young
|
|
|
Sam Phone #: ###-####
|
BLD-Energy code compliance | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | PART |
Tony Young
|
|
|
Sam Phone #: ###-####,, seal pack ok,, ok to insulate walls where double shear goes by stairs,, need to complete other hold downs
|
BLD-Framing/Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Jim Sly
|
|
|
Samuel Phone #: ###-#### Should be Shear Insp........Partial Ext. nailing insp. of select walls.
|
BLD-Wall Bracing | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | CANC |
Tony Young
|
|
|
Phone #: ###-####
|