Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-01324
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 225 N 9TH ST
Project Name9th & Idaho Building Lobby TI
Customer Number 
ePlanReviewYes
Description
** (9th & IDAHO BUILDING - 1ST STORY LOBBY REMODEL) ** This building is fire sprinklered to comply with high-rise provisions. Permit is to remodel an existing 1,615 sq. ft. lobby area within an existing 8 story building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select non-load bearing brick, removal of select furred out walls, removal of select gypsum ceiling, removal of select suspended acoustic ceiling, construction of select non-load bearing walls, construction of select gypsum ceiling soffit, relocate existing light fixtures, electrical work, mechanical ductwork and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Note: existing one hour rated lobby corridor walls to be maintained. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/8/20172/8/20172/8/2017PPASS
DetailsDave Hannah
Call half hour before // Garrett Phone #: ###-####
DOC - Permit Finaled2/8/20172/8/20172/8/2017PPASS
DetailsDave Hannah
FIRE-Final Inspection2/7/20172/8/20172/8/2017PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are mounted in common area's with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection1/19/20171/19/20171/19/2017PCANC
DetailsJim Page
Final life fire safety inspection cancelled per conversation with Garret Phone #: ###-####, egress lighting was not ready for testing.
BLD-Framing/Rough-in12/6/201612/7/201612/7/2016APASS
DetailsDave Hannah
Call 30 mins before // Garett Phone #: ###-####