BLD-Final | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Jim Sly
|
|
|
Ian// ###-####
|
FIRE-Final Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I spoke to the contractor about the requirement that all fire lanes associated with each individual building being signed off will need to remain free of obstructions. I was assured that they would remain so.
|
BLD-Framing/Rough-in | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-####
|
FIRE-Final Inspection | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final inspection. I met with the general contractor and went over required life safety requirements to get this building signed off while others are unfinished. The biggest issue will be fire dpt access. I degerred him to Scott for temporary approval of fire lanes.
Jake Phone #: ###-####
|
BLD-Concrete | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PART |
Jim Sly
|
|
|
Milten Phone #: ###-#### Foundation edge and slab OK pending MTI special inspection, tests and approvals.
|