Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD16-01415
StatusFinaled
Name QUINN TERENCE M
Site Address 2722 W PLEASANTON AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
The scope of work is to enlarge the master bathroom by moving non-load bearing partion walls. Also, move toilet in hall bath for better functionality. Two new windows will be installed in the bathrooms; the one located in the hall bath shall be tempered. Smoke and carbon monoxide detectors shall be hardwired together to meet code. Plumbing and electrical permits will be pulled by the trades. Work will be performed per the approved plans and local codes. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/13/201610/17/201610/17/2016APASS
DetailsDave Hannah
please give me a call when on way - Beth @ ###-#### Phone #: ###-#### Inspection requested via web by Terry Quinn
DOC - Permit Finaled10/17/201610/17/201610/17/2016PPASS
DetailsDave Hannah
BLD-Aging Inspection9/30/20169/30/201610/7/2016 PEND
DetailsDave Hannah
BLD-Framing/Rough-in5/18/20165/19/20165/19/2016APASS
DetailsPhil Shearer
Terry Phone #: ###-####
BLD-Framing/Rough-in5/13/20165/16/20165/18/2016PPART
DetailsDave Hannah
Brock Phone #: ###-####-please go as late as poss as the hvac is going to be done early pm as well ok to insulate needs mec r/i and beam calcs for pockit door old back bearing wall