BLD-Final | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | NR |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Needs blower door test. Everything else ok.
|
BLD-Energy code compliance | 7/6/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD-Framing/Rough-in | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane. Nail 2ply FG01 truss per the truss engineering. Complete the lateral bracing on the T02 and T03 trusses. Fireblock Barrel Vault in hallway. Provide the 4 SDS screws on the 2x12 at kitchen at each stud. Foam all holes in floor under tubs and showers. Correction notice posted. ok to insulate.
|
BLD-Wall Bracing | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | CANC |
Mike Jordan
|
|
|
Zane Phone #: ###-####. Shear inspection onthis has already been done.
|
BLD-Wall Bracing | 6/29/2016 | 7/1/2016 | 6/30/2016 | P | CANC |
Mike Jordan
|
|
|
Zane Phone #: ###-####. Wrong permit called in.
|
BLD-Wall Bracing | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 6/15/2016 | 6/16/2016 | 6/16/2016 | A | FAIL |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 5/26/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Noted that column pad footings need to be 10 inches deep per approved plans. Contacted Heron with aggregate to let him know. Heron noted that he would have his crew dig out the additional 2 inches.
|