BLD-Final | 7/25/2016 | 7/25/2016 | 7/26/2016 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/14/2016 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/13/2016 | 7/13/2016 | 7/14/2016 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
FIRE-Final Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Zack
|
BLD-Ceiling Grid Inspection | 7/8/2016 | 7/8/2016 | 7/10/2016 | P | PART |
Dave Hannah
|
|
|
Zack Phone #: ###-#### phase two ok to cover
|
BLD-Conference | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Mike Jordan
|
|
|
Zack Phone #: ###-####
|
FIRE-Conference | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | DONE |
Jim Page
|
|
|
Fire conference complete, discussed area's that would be acceptable to cover with ceiling tile.
|
BLD-Ceiling Grid Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PART |
Dave Hannah
|
|
|
Zach Phone #: ###-#### phase one ok to cover
|
BLD-Conference | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | DONE |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|