BLD-Final | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
FIRE-Final Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Ed Phone #: ###-####
|
BLD-Energy code compliance | 12/8/2017 | 12/11/2017 | 12/13/2017 | P | PASS |
Dave Hannah
|
|
|
3 remaining units // Berry Phone #: ###-####
|
BLD-Energy code compliance | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
BLD-Energy code compliance | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Jim Sly
|
|
|
Partial for units 101 & 102 - Call Ed with ?s Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Jim Sly
|
|
|
Barry-(4 way) hvac drops whole building Phone #: ###-####
|
BLD-Framing/Rough-in | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, verify seal pack,, wip,, fix cut floor joist,, ok to insulate
|
BLD-Energy code compliance | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PART |
Tony Young
|
|
|
Berry Phone #: ###-#### ,, insulation behind tubs/shower areas ok after fireblocking plate lines
|
BLD-Wall Bracing | 7/10/2017 | 7/11/2017 | 7/12/2017 | A | PART |
Tony Young
|
|
|
Shear // Ed Phone #: ###-####,, exterior ok
|
BLD-Other | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Tony Young
|
|
|
Concrete - Ed Phone #: ###-####,, slab and interior footings
|
BLD-Footing | 5/8/2017 | 5/8/2017 | 5/9/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, pending special inspection
|
BLD-Foundation | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,pending special inspector results
|
BLD-Footing | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####, ok, pending special inspection results/report
|