BLD-Framing/Rough-in | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Jim Sly
|
|
|
would like call ahead; Jesse Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | NR |
Jim Sly
|
|
|
Jesse Phone #: ###-#### Need Rough in inspections
|
BLD-Conference | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | DONE |
Jim Sly
|
|
|
Gary Phone #: ###-#### Need all trade approvals......
|
BLD-Framing/Rough-in | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Need all trade rough-ins Completed. Walk Thru.....2 stairways do not meet code....strap beams at butt joints.
|
BLD-Framing/Rough-in | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PART |
Jim Sly
|
|
|
John Phone #: ###-#### Exterior shear nailing....OK.
|
BLD-Wall Bracing | 9/14/2016 | 9/16/2016 | 9/16/2016 | P | NR |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2016 | 9/15/2016 | 9/15/2016 | P | CANC |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PART |
Jim Sly
|
|
|
John Phone #: ###-#### Garage OK.
|
BLD-Foundation | 7/19/2016 | 7/19/2016 | 7/20/2016 | P | PART |
Jim Sly
|
|
|
John Phone #: ###-#### Footing for Garage ....OK
|
BLD-Footing | 7/15/2016 | 7/18/2016 | 7/18/2016 | P | CANC |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Footing | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | CANC |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PART |
Jim Sly
|
|
|
John Phone #: ###-#### House addition wall only.....OK
|
BLD-Footing | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | PART |
Jim Sly
|
|
|
Joe Phone #: ###-#### Footing for house addition only..........OK
|
BLD-Footing | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | FAIL |
Jim Sly
|
|
|
John ###-#### Not per approved plan for depth, width, or Portal Frame Constr....
|
BLD-Conference | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | DONE |
Jim Sly
|
|
|
John 405 5775
|
BLD-Footing | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | PART |
Jim Sly
|
|
|
John 405 5775 Appears OK but need to se approved plan before pouring.......Re-sched........
|
BLD-Final | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | CANC |
Jim Sly
|
|
|
John 405 5775
|
BLD-Footing | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | CANC |
Jim Sly
|
|
|
John Phone #: ###-####
|