BLD-Conference | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Wall cover | 8/13/2018 | 8/13/2018 | 8/14/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Wall cover | 8/8/2018 | 8/9/2018 | 8/10/2018 | P | PASS |
Dave Hannah
|
|
|
Kitchen / restaurant area walls Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Framing/Rough-in | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | CANC |
Dave Hannah
|
|
|
Partial interior non bearing walls Phone #: ###-#### Inspection requested via web by Steve Jones columns raps ok after elec rough ins
|
BLD-Framing/Rough-in | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones soffits under drive though
|
BLD-Framing/Rough-in | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Mike Jordan
|
|
|
Chris-partial-ceiling next to room 301 and 302 Phone #: ###-####
|
BLD-Framing/Rough-in | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PART |
Dave Hannah
|
|
|
Third floor // Chris Phone #: ###-#### door way in hall ok to cover
|
BLD-Framing/Rough-in | 6/17/2016 | 6/17/2016 | 6/20/2016 | P | PASS |
Dave Hannah
|
|
|
3rd floor // Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PART |
Dave Hannah
|
|
|
Steve-fire clauking Phone #: ###-#### 3rd floor west side rooms ok to cover
|