Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD16-01929
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1072 N LIBERTY ST Unit: 211
Project NameSARMC Pediatric Surgery #211
Customer Number 
ePlanReviewYes
Description
(SAINT ALPHONSUS PEDIATRIC SURGERY CLINIC – 2nd FLOOR – SUITE #211) //Plan modification to change type of ceiling at room 225 from gypsum to suspended acoustic ceiling, to remove new millwork and enlarge room 208, to enlarge room 229, relocate door/door frame at room 230, relocate select new light fixtures, change new light fixture type at room 225. 9-19-2016 JG // The fire sprinkler system is used for building area and story increase. Permit to build-out and finish a 4,180 sq. ft. portion of the existing 22,000 sq. ft. 2nd floor for use as a medical office space per approved plans. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior nonbearing walls to create (5) offices, a break room, (2) ADA accessible restrooms, (8) exam rooms, intake area, consult room, waiting area, reception area, coding area, area tem areas, a lab room, soil room, utility room, hallways and an electric room, millwork, new suspended acoustic ceilings, new light fixtures, electrical work, mechanical work plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/20/201611/21/201611/21/2016APASS
DetailsMike Jordan
Call Brad Turk. ###-#### Phone #: ###-#### Inspection requested via web by Darius Saxton. Ok for perm occ.
FIRE-Final Inspection11/21/201611/21/201611/21/2016PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection11/18/201611/18/201611/18/2016PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD-Final11/18/201611/18/201611/18/2016PNR
DetailsJim Sly
Late afternoon if possible Phone #: ###-#### Inspection requested via web by Darius Saxton
Need Mech and.................
FIRE-Final Inspection11/18/201611/18/201611/18/2016PFAIL
DetailsTroy Cobbley
The life safety can be finaled when the project related fire alarm permit has been addressed.
BLD-Ceiling Grid Inspection11/10/201611/14/201611/14/2016ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD-Framing/Rough-in9/8/20169/8/20169/8/2016PPASS
DetailsMike Jordan
Please call before arriving so that I can meet you. Phone #: ###-#### Inspection requested via web by Darius Saxton. Interior steel stud framed walls ok.