BLD-Final | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-#### handrails on 5th st ok
|
BLD-Conference | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | DEFR |
Brandon Shaw
|
|
|
Adam Phone #: ###-####
|
BLD-Aging Inspection | 5/1/2019 | 5/1/2019 | 5/2/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Dave Hannah
|
|
|
Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Jim Page
|
|
|
Final pahse 5 for project complete, final inspection for life fire safety complete.
Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | DONE |
Dave Hannah
|
|
|
Conference to Review ADA at Roof Deck Countertop. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for phase 4 TCO complete. Phase 3 of TCO aggreement still needs to be completed for life fire safety.
Phase 4 TCO, Plaza Park. Call Adam with any questions. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PART |
Dave Hannah
|
|
|
Phase 4 TCO, Plaza Park. Call Adam with any questions. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson phase 4 ok
|
BLD-Final | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Dave Hannah
|
|
|
TCO final inspections, phase 2, Loft Units. Please contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco
|
FIRE-Final Inspection | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Jim Page
|
|
|
Life fire safety inspection for Phase 2 TCO complete.
TCO final inspections, phase 2, Loft Units, follow up to walk last week. Please contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PEND |
Dave Hannah
|
|
|
Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco of garage
|
FIRE-Final Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for Phase 5 TCO complete.
Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 11/12/2018 | 11/13/2018 | 11/16/2018 | | DONE |
Dave Hannah
|
|
|
Requesting inspection for Phase 1 TCO plan final. Please coordinate with Adam for details prior to heading to site. ###-####. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 11/14/2018 | 11/14/2018 | 11/15/2018 | P | PEND |
Dave Hannah
|
|
|
TCO Phase 1 inspection. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 11/15/2018 | 11/15/2018 | 11/15/2018 | A | PEND |
Dave Hannah
|
|
|
Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PART |
Dave Hannah
|
|
|
Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson phase one ok for tco
|
FIRE-Final Inspection | 11/15/2018 | 11/15/2018 | 11/15/2018 | A | PART |
Jim Page
|
|
|
Per conversations with Ron Johnson, Tim Frost and Lee Meridith items for phase 1 TCO complete.
Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | FAIL |
Troy Cobbley
|
|
|
see fire inspection comments in documents 11-14-18TCO Phase 1 inspection. Review items from walk yesterday with Ron. Please call Adam when heading to site. ###-####.Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 11/12/2018 | 11/13/2018 | 11/14/2018 | P | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see fire inspections in documents 11-13-18Requesting inspection for Phase 1 TCO plan final. Please coordinate with Adam for details prior to heading to site. ###-####. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Conference | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Jim Page
|
|
|
Fire conference complete.
Scheduled meeting at 1PM for TCO plan
|
FIRE-Conference | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete, discussed corrective items before TCO.
Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | DONE |
Dave Hannah
|
|
|
Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/24/2018 | 10/24/2018 | 10/25/2018 | P | PASS |
Dave Hannah
|
|
|
Lobby hard lid drops at restroom and sales office. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Dave Hannah
|
|
|
Blown in insulation at the covered parking area, ready for inspection so we can cover. Call Adam with questions. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PART |
Dave Hannah
|
|
|
Loft Units, 112, 114, 115. Also Lobby and corridor high soffits and beam wraps, call adam when heading to site.
Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PART |
Mike Jordan
|
|
|
Soffits in loft units, 1st. floor, 3 units each on west and east sides of building. Noted areas still required fire stopping or need to be boxed out.
|
BLD-Conference | 10/14/2018 | 10/15/2018 | 10/15/2018 | A | DEFR |
Brandon Shaw
|
|
|
Review soffits in loft units. Review assemblies at lobby area. Please call Adam thank. AKJwhen heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | FAIL |
Dave Hannah
|
|
|
A handful of items to review on L1 sofits and lobby. Call Adam when heading to site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | CANC |
Dave Hannah
|
|
|
A handful of items to review on L1 sofits and lobby. Call Adam when heading to site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Dave Hannah
|
|
|
Please find Trevor to discuss a few items related to the project. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/26/2018 | 9/26/2018 | 9/27/2018 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Energy code compliance | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Dave Hannah
|
|
|
1st floor lobby, ready for cover. Verify insulation per walk on Thursday with Adam. Call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PART |
Dave Hannah
|
|
|
Lobby area, Detail walk required with Adam. Please call when heading to site.###-####, thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
|
BLD-Conference | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | DONE |
Dave Hannah
|
|
|
Review firestop at carport parking, West of ramp. Ready to cover hard lids and patch insulation. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Dave Hannah
|
|
|
Trevor and Adam would like to discuss a few different topics. Please call Adam when available to come to site. Thanks AKJ ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 9/7/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Jim Sly
|
|
|
Inspection of fireproofing patch at future retail. Insulation complete ready to cover. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Dave Hannah
|
|
|
Review retail monakote patching in the retail space. Want to continue insulation at ceiling adjacent to these patches. A few other items may be available, please find Adam or Trevor when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PART |
Dave Hannah
|
|
|
Retail Space, Rough in inspection for insulate. Please notify adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Dave Hannah
|
|
|
Framing cover on 1st floor lofts that are ready. Coordinate with Adam when on site. AKJ ###-####.
Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/20/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Dave Hannah
|
|
|
Adam-inspection is not for the plan mod Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2018 | 8/22/2018 | 8/23/2018 | P | PART |
Dave Hannah
|
|
|
Adam-inspection is not for the plan mod Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2018 | 8/16/2018 | 8/17/2018 | P | PART |
Dave Hannah
|
|
|
1st floor loft unit framing inspection. Looking to start insulation after MEC verification. Please call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok nto insulate ext walls
|
BLD-Wall cover | 8/9/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Dave Hannah
|
|
|
3rd floor soffits for cover. MEP inspections are on for AM Monday. Please call Adam before visiting site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Dave Hannah
|
|
|
3rd floor soffits for cover. MEP inspections Were Completed Friday. Please call Adam before visiting site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Dave Hannah
|
|
|
Reworked assemblies on remaining Level 4 soffits.
Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/30/2018 | 7/30/2018 | 7/31/2018 | P | DONE |
Dave Hannah
|
|
|
Recap list for inspection needs. Coordinate with Adam when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PART |
Dave Hannah
|
|
|
5th Floor Corridor Soffits, Confirmed and ready for cover.
4th Floor unit soffits, 416 to 410. In Progress with Firestop repairs. akj Phone #: ###-#### Inspection requested via web by Adam Johnson 5th floor only
|
BLD-Conference | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
Level 5 soffits, 12 to 15. Level 2 draft stop at corridor. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Dave Hannah
|
|
|
2nd floor south east units ready for cover inspection. 209 to 216.Call Adam when you are heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | FAIL |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Dave Hannah
|
|
|
Catch up from Friday. MEP inspections complete on Level 2, seeking approval to insulate. 5th floor pick up at soffit areas. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/12/2018 | 7/13/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Remaining units for soffit cover on Level 5, Rooms 17,18,19, 9, 11, 12, 13, 14, 15, 16.
Mike A. Is covering for Adam. Please call Mike, ###-####.
Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | CANC |
Dave Hannah
|
|
|
Walk 3rd floor areas for areas ready to insulate. Please call Adam when heading to site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
|
BLD-Framing/Rough-in | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PART |
Dave Hannah
|
|
|
Dave. Adam is out. Hope will walk with you. 3rd floor cover so we can insulate. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Dave Hannah
|
|
|
4th floor insulation complete. Walk with Adam to verify draft stop and cover. Call Adam when heading to site. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 6/27/2018 | 6/28/2018 | 6/29/2018 | A | PASS |
Dave Hannah
|
|
|
Area B cover inspection at 4th floor. Call Adam when heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate ext walls
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | CANC |
Dave Hannah
|
|
|
Area B cover inspection at 4th floor. Call Adam when heading to the site. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson
|
BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PART |
Dave Hannah
|
|
|
Framing Inspection, level 4. Call Adam when heading to site. Thanks, AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson see sign off sheet ok to insulate
|
BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Tony Young
|
|
|
4th Floor framing inspection, firestop OK, ready to insulate following AM MEP inspections passing. Whomever is covering for Hannah, please call Adam before heading to site. ###-####. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson,, 4TH FLOOR area A,, work in progress on fire caulking,, need to block at 10' on double walls,, ceiling/roof in 401 ok to foam,, ok to start insulation in exterior walls
|
BLD-Wall cover | 6/18/2018 | 6/20/2018 | 6/20/2018 | P | NR |
Dave Hannah
|
|
|
Pre walk Level 4, prep for insulation, review of fire stop assemblies. . Call Adam when heading to site. akj 061818 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 6/13/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Dave Hannah
|
|
|
Pre-walk level five west, Insulation complete, ready for inspection. MEP cover inspections in field binder for reference. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 6/18/2018 | 6/19/2018 | 6/19/2018 | P | PEND |
Dave Hannah
|
|
|
Continued walk of 5th floor. Areas of cover. Follow up to Fridays walk on a few key areas. Call Adam when heading to site. akj 061818 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 6/13/2018 | 6/15/2018 | 6/18/2018 | P | PASS |
Dave Hannah
|
|
|
Pre-walk level five west. In prep for pre insulate. Will be part Thursday, Part Friday. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 | P | PEND |
Dave Hannah
|
|
|
Pre-walk level five west. In prep for pre insulate. Will be part Thursday, Part Friday. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Dave Hannah
|
|
|
Remaining shear inspection at North East and East Elevation, three up. Contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/23/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Dave Hannah
|
|
|
Exterior Sheathing at North Elevation to level 3. Notes in office to discuss other topics. Draft Stop ect. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PART |
Dave Hannah
|
|
|
Request a late AM inspection of East elevation exterior nailing at shear-Pre Rock inspection. Call Adam before heading to site. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok up to level 3
|
BLD-Conference | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Dave Hannah
|
|
|
Roof Inspection, Nailing and straps, west side of roof. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-#### ok to cover south ext wall
|
BLD-Conference | 5/1/2018 | 5/2/2018 | 5/3/2018 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### sear west side ok
|
BLD-Conference | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PART |
Dave Hannah
|
|
|
Inspection of 1st floor shear walls at exterior. Also inspection on 2nd floor Earthbound devices in the pre rock areas as discussed Tuesday. Supplemental information from Engineer available in the office. Please contact Adam when available to visit site. Phone #: ###-#### Inspection requested via web by Adam Johnson more first floor shear and 4 holds on 2and 3 floor the ones in the wall behind showers ok pens pulled
|
BLD-Conference | 4/16/2018 | 4/17/2018 | 4/17/2018 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### shear wall on first floor south side of bldg
|
BLD-Conference | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | FAIL |
Dave Hannah
|
|
|
Andrew Phone #: ###-#### shear on first floor
|
BLD-Conference | 4/3/2018 | 4/4/2018 | 4/5/2018 | P | DONE |
Dave Hannah
|
|
|
Adam-Adam says this has nothing to do with the plan mod that''s in the office Phone #: ###-####
|
BLD-Conference | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | DONE |
Dave Hannah
|
|
|
Adam-doesn''t have anything to do with the plan mod that''s in for review Phone #: ###-####
|
BLD-Conference | 3/22/2018 | 3/22/2018 | 3/23/2018 | P | DONE |
Dave Hannah
|
|
|
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
|
BLD-Conference | 3/22/2018 | 3/22/2018 | 3/22/2018 | A | CANC |
Dave Hannah
|
|
|
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
|
BLD-Conference | 3/21/2018 | 3/21/2018 | 3/22/2018 | P | CANC |
Dave Hannah
|
|
|
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
|
BLD-Conference | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | DONE |
Dave Hannah
|
|
|
12:30 Conference as requested by KPFF to review structural framing, ASI 10 per City Review. Meeting at 5th and Idaho conference room. Please call Adam with any questions.. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/9/2018 | 3/9/2018 | 3/9/2018 | A | DONE |
Dave Hannah
|
|
|
12:30 Conference as requested by KPFF to review structural framing, ASI 10 per City Review. Meeting at 5th and Idaho conference room. Please call Adam with any questions.. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | DONE |
Dave Hannah
|
|
|
Walk 2nd floor framing. Review a few things with Trevor and Adam. Please call Adam when heading to site. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 2/28/2018 | 2/28/2018 | 3/1/2018 | A | PART |
Dave Hannah
|
|
|
Framing walk 2nd floor. Ongoing. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 2/27/2018 | 2/27/2018 | 2/28/2018 | P | CANC |
Dave Hannah
|
|
|
Framing walk 2nd floor. Ongoing. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | PART |
Dave Hannah
|
|
|
Framing shear inspection at 2nd floor walls. Call Adam when in route. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson crew working on second floor .
|
BLD-Conference | 2/12/2018 | 2/15/2018 | 2/16/2018 | A | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | DONE |
Dave Hannah
|
|
|
Status update of project. Framing review. On site conference request. Call Adam when heading to site. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | DONE |
Dave Hannah
|
|
|
Framing Pre-Construction meeting at 11:00 AM. We will meet in the conference room atop wise guys. Call Adam with any questions. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | DONE |
Dave Hannah
|
|
|
Dave, Please call Adam, ###-####. thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/20/2017 | 10/26/2017 | 10/26/2017 | A | DONE |
Dave Hannah
|
|
|
Request for Dave Hannah attendance to PT PreCon Meeting, 5th and Idaho Subcontractor conference room. Meeting at 10:30. Call Adam for details, ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|