BLD-Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Final | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | NR |
Jim Storey
|
|
|
John Phone #: ###-#### need plm and mech
|
FIRE-Final Inspection | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is in common area with a current i nspection tag. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | CANC |
Jim Page
|
|
|
Spoke with point of contact, John Phone #: ###-####, tenant space is not ready for final life fire safety inspection, this inspection request cancelled per conversation with John and a new inspection request will be scheduled for a later date.
|
BLD-Ceiling Grid Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Mike Jordan
|
|
|
Tony Phone #: ###-####
|
BLD-Wall cover | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2016 | 7/28/2016 | 7/29/2016 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|