BLD-Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart. Repair holes in 2hr. wall in attic, both sides and in garage. Reinstal the lateral brace on A09 truss that was cut. Fill holes in draft stop on second floor framing. Correction notice posted. Ok to insualte.
|
BLD-Wall Bracing | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Wall Bracing | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart. No approved plans on site.
|