BLD-Final | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Jim Storey
|
|
|
on the front porch is a lock box with the key inside the code to the lock box is 3380. Please call Joe Perdew if you have any questions. Thank you. Phone #: ###-#### Inspection requested via web by Joe Perdew
|
DOC - Permit Finaled | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 2/17/2017 | 2/22/2017 | 2/22/2017 | A | PASS |
Mike Jordan
|
|
|
Blown in Blanket insulation Phone #: ###-#### Inspection requested via web by Joe Perdew
|
BLD-Framing/Rough-in | 2/17/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Jim Storey
|
|
|
The approved plans ; permit are sitting on the stairs Phone #: ###-#### Inspection requested via web by Joe Perdew c/n fire block 2nd floor duct chase at ceilling.
|
BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-#### sheer and soffit ok
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | FAIL |
Jim Storey
|
|
|
Shear // Joe Phone #: ###-#### no plans on site/ nailling with out blk at butt joints front and back?
|
BLD-Footing | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Jim Storey
|
|
|
Lynn Phone #: ###-####
|