BLD-Final | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Storey
|
|
|
robert Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 3/24/2017 | 3/24/2017 | 3/27/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PART |
Dave Hannah
|
|
|
would like call ahead; Sam Phone #: ###-#### insulation is ok but still missing two hold downs or strapes second floor wall over mec in garage
|
BLD-Energy code compliance | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PEND |
Dave Hannah
|
|
|
would like call ahead; Sam Phone #: ###-#### insulation is ok but still missing two hold downs or strapes second floor wall over mec in garage
|
BLD-Framing/Rough-in | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | PART |
Jim Storey
|
|
|
Sam Phone #: ###-#### ok to insulate/ pending hardware for brace pannel or sign off from designers.
|
BLD-Framing/Rough-in | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | FAIL |
Jim Storey
|
|
|
Sam Phone #: ###-#### c/n posted
|
BLD-Wall Bracing | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Jim Storey
|
|
|
Shear // Sam Phone #: ###-####exterior nailling ok need hd hardware at framing
|
BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | DEFR |
Jim Storey
|
|
|
Shear // Sam Phone #: ###-####
|
BLD-Wall Bracing | 1/18/2017 | 1/19/2017 | 1/19/2017 | A | NR |
Jim Storey
|
|
|
Shear // Sam Phone #: ###-####
|
BLD-Wall Bracing | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | NR |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Provide the engineering. Noted several areas that were missed and exterior straps not fastened.
|
BLD-Footing | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Jim Storey
|
|
|
Will be ready by 10 // Dan Phone #: ###-####
|