Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD16-03635
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 408 E PARKCENTER BLVD Unit: 200
Project NameApex Manufacturing - Ste #200
Customer Number 
ePlanReviewYes
Description
(APEX MANUFACTURING – SUITE #200) Permit is to remodel an existing 2,947 sq. ft. by combining the adjacent 3,700 sq. ft. space to create a total of 6,647 sq. ft. office tenant space. Approval is contingent upon adhering to the approved plans on file. Work includes: removal of select interior non-load bearing tenant demising wall, removal of interior nonbearing walls at offices, electrical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/201612/5/201612/5/2016PPASS
DetailsJim Storey
Mark Phone #: ###-####
DOC - Permit Finaled12/5/201612/5/201612/5/2016PPASS
DetailsJim Storey
FIRE-Final Inspection12/2/201612/5/201612/5/2016APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are mounted in common area's with current inspection tags. Final life fire safety insepction passed/complete.
FIRE-Final Inspection11/30/201612/1/201612/1/2016ACANC
DetailsJim Page
Inspection request cancelled due to FIR permits associated with project still in issued status. FIR permits need to be inspected and finaled before life fire safety inspection can be performed. Inspection will need to be rescheduled.