BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Jim Storey
|
|
|
call for garage code// Jeanette Elledge ###-####
|
DOC - Permit Finaled | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 2/8/2017 | 2/9/2017 | 2/9/2017 | A | PASS |
Jim Storey
|
|
|
Janette Phone #: ###-####
|
BLD-Framing/Rough-in | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | PASS |
Jim Storey
|
|
|
janine Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2017 | 2/6/2017 | 2/6/2017 | A | PART |
Jim Storey
|
|
|
Jeannette Phone #: ###-#### c/n 3ply bgirder nailling/ overbuild stagered support spaced per engineering. ok to insulate
|
BLD-Framing/Rough-in | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | DEFR |
Jim Storey
|
|
|
Jeannette Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 1/23/2017 | 1/25/2017 | 1/24/2017 | A | DONE |
Jim Storey
|
|
|
Meet framing supervisor Rusty Howard for inspection, same time as wall inspection. Phone #: ###-#### Inspection requested via web by Jeanette Elledge
|
BLD-Wall Bracing | 1/23/2017 | 1/25/2017 | 1/24/2017 | A | PASS |
Jim Storey
|
|
|
Meet framing supervisor Rusty Howard for inspection, same time as final framing inspect. Phone #: ###-#### Inspection requested via web by Jeanette Elledge ok to cover exterior
|
BLD-Conference | 1/13/2017 | 1/17/2017 | 1/17/2017 | A | DONE |
Jim Sly
|
|
|
would like call ahead; jeanette Phone #: ###-#### Met with Jeanette and NEW framer. Previous framer did not do portal framing as shown on approved plan. Engineer only to approve as is..........provide fix,...........or demand completion per approved plan.
|
BLD-Wall Bracing | 12/21/2016 | 12/22/2016 | 12/22/2016 | P | NR |
Jim Sly
|
|
|
Jeneantte-as per Jeneatte please don''t pas frame unless windows are in Phone #: ###-#### No windows........Need to complete all blocking....nailing staps, panels.......etc. No approved plans on site.
|
BLD-Framing/Rough-in | 12/21/2016 | 12/22/2016 | 12/22/2016 | P | NR |
Jim Sly
|
|
|
Jeneantte-as per Jeneatte please don''t pas frame unless windows are in Phone #: ###-#### Need all trade rough-in inspections prior to calling for frame insp.
|
BLD-Foundation | 11/1/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/31/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/28/2016 | 10/31/2016 | 10/31/2016 | P | NH |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/27/2016 | 10/28/2016 | 10/28/2016 | P | NR |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/26/2016 | 10/27/2016 | 10/27/2016 | P | NR |
Jim Storey
|
|
|
Dane Phone #: ###-####
|