Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD16-03759
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 8248 W VICTORY RD
Project NameSuez Water
Customer Number 
ePlanReviewYes
Description
**(SUEZ WATER)** Permit is to remodel an existing 471 sq. ft. of office space within a 17,500 sq. ft. building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select walls, removal of select door/door frame and relocate, removal of select act ceiling, construction of select interior nonbearing walls to create (3) offices, new door/door frame, select new acoustic ceiling, relocate existing light fixtures, electrical work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/201611/30/201611/30/2016PPASS
DetailsMike Jordan
Please call 30 mins before inspection. Phone #: ###-#### Inspection requested via web by Shane Treasure
DOC - Permit Finaled11/30/201611/30/201611/30/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection11/29/201611/30/201611/30/2016APASS
DetailsTroy Cobbley
Life safety passed. I noted a audible sync problem with the fire alarm system. As per Assistant Chief Ron this issue will need addressed prior to the next remodel.
BLD-Ceiling Grid Inspection11/22/201611/23/201611/23/2016PPASS
DetailsMike Jordan
Request by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
BLD-Framing/Rough-in11/10/201611/10/201611/10/2016PPASS
DetailsMike Jordan
Please call 30mins before inspection
Thanks
Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure