BLD-Final | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | PASS |
Tony Young
|
|
|
Lance Phone #: ###-####
|
DOC - Permit Finaled | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Energy code compliance | 1/27/2017 | 1/27/2017 | 1/27/2017 | P | PASS |
Dave Hannah
|
|
|
Insulation // Lance Phone #: ###-####
|
BLD-Energy code compliance | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PEND |
Jim Sly
|
|
|
Lance Phone #: ###-#### Call when Insulated.
|
BLD-Framing/Rough-in | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PART |
Tony Young
|
|
|
Lance Phone #: ###-####,, need to verify seal package,, need straps on top plates not lapped 24",, need plans and truss engineering
|
BLD-Framing/Rough-in | 12/27/2016 | 12/27/2016 | 12/27/2016 | P | NR |
Jim Sly
|
|
|
Lance Phone #: ###-#### Need all trade R/In s approved
|
BLD-Wall Bracing | 12/27/2016 | 12/27/2016 | 12/27/2016 | P | PASS |
Jim Sly
|
|
|
Lance Phone #: ###-#### Ext nailing. Spot checked......Appears to be done and OK.
|
BLD-Wall Bracing | 12/21/2016 | 12/22/2016 | 12/22/2016 | P | PART |
Tony Young
|
|
|
Shear // Lance Phone #: ###-####... exterior shear ok
|
BLD-Wall Bracing | 12/21/2016 | 12/21/2016 | 12/21/2016 | P | FAIL |
Tony Young
|
|
|
Shear // Lance Phone #: ###-####,, not per plan,, already wrapped
|
BLD-Framing/Rough-in | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PART |
Tony Young
|
|
|
Lance Phone #: ###-####,, ok to deck the floor
|
BLD-Footing | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Phil Shearer
|
|
|
Lance Phone #: ###-####
|