Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-04140
StatusFinaled
Name BRIGHTON HOMES IDAHO INC
Site Address 4796 S CHUGWATER WAY
Project NameRH-07-1109 Pacific
Customer Number 
ePlanReviewYes
Description
WUI Zone B, abutting undeveloped property (WUI Zone 'A' requirements); Permit for the construction of a new 3575 sq. ft., two story (first story 1400 sq. ft., second story 1615 sq. ft., and 500 st. ft. attic bonus room above) single family dwelling with 7 bedrooms, 4.5 bathrooms, approximately 218 sq. ft. of covered patio/porch and a 1000 sq. ft. attached garage per the approved plans, ACCA report and any notations. SP-02 zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20176/28/20176/28/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
DOC - Permit Finaled6/28/20176/28/20176/28/2017PPASS
DetailsBrandon Shaw
BLD-Final6/27/20176/27/20176/27/2017ANR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
Need Electrical final
BLD-Energy code compliance3/31/20173/31/20173/31/2017APASS
DetailsDave Hannah
Inspection requested via web by Erby Gonzales
BLD-Framing/Rough-in3/29/20173/29/20173/29/2017PPASS
DetailsJim Sly
This is ready AM, if you are I then area. Plans at furnace platform
###-#### Inspection requested via web by Erby Gonzales
BLD-Other3/21/20173/22/20173/22/2017APASS
DetailsJim Sly
This is for fire boxes around exterior can lights in the soffit. Looking for the OK to continue with installing Sheetrock in the soffits Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Wall Bracing3/6/20173/7/20173/7/2017PPASS
DetailsJim Storey
Shear inspection Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Footing12/28/201612/28/201612/28/2016PPASS
DetailsPhil Shearer
Sergio Phone #: ###-####
BLD-Foundation12/28/201612/28/201612/28/2016PPASS
DetailsPhil Shearer
Sergio Phone #: ###-####
BLD-Footing12/22/201612/22/201612/22/2016PPART
DetailsTony Young
Surgieo Phone #: ###-####,, work in progress,, has been tented and heated,, will comply with the cold weather requirements after pouring the footings
BLD-Footing12/21/201612/21/201612/21/2016PNR
DetailsJim Sly
Serigo Phone #: ###-####
No call from concrete contractor that they had no intension of pouring footing. I arrived to find that the excavation for footings was done on Monday. The average daily temp has been 23 degrees for last 2 days. The ground is frozen, and workers are covering it with plastic covering. There are 2 propane heaters staged for future use. It took me 1 hr to find this site. I called concrete contractor (sergio) and any phone # I could find for Brigjhton Homes. No return calls.