BLD-Final | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Dave Phone #: ###-####
|
FIRE-Final Inspection | 10/10/2017 | 10/11/2017 | 10/11/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the city approved plans, exit discharge light and the fire door installed/tested.
Dave Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | NR |
Jim Storey
|
|
|
Dave Phone #: ###-#### Zach Phone # ###-#### pending hvac aprovals
|
BLD-Wall cover | 8/22/2017 | 8/22/2017 | 8/23/2017 | P | PASS |
Jim Sly
|
|
|
call for access- Dave Phone #: ###-####
|
BLD-Energy code compliance | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Jim Sly
|
|
|
Call for access // Dave Phone #: ###-####
|
BLD-Conference | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | DONE |
Jim Sly
|
|
|
dave Phone #: ###-####
|