Permit Information
Permit NumberBLD16-04266
StatusFinaled
Name EXCELSIOR CONSTRUCTION CO
Site Address 150 N CAPITOL BLVD
Project NamePDS 2nd floor remodel
Customer Number 
ePlanReviewYes
Description
(CITY HALL)(PDS 2ND FOOR)(BISTRO)Plan modification for parallel approach change at lactation room sink, replace over head door with sliding door between confrence room and break room, revised layout for breakroom kitchen space. see notes on plans for approvals. **ajs**4/5/17Remodel of 3,367 SF in existing PDS department on 2nd floor of City Hall in 3 areas, Building 1. ALt #1 removed from scope of project as noted on drawings. Scope of work to include a new break room, conference and lactation room. Interior finishes, non bearing non combustible partition walls, mechanical, plumbing, and electrical work to be included. Occupant load of assembly area shall be posted. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/31/2017 DONE
fixed issued date
FIRE-Final Inspection8/22/20178/22/20178/22/2017PPASS
DetailsJim Page
Previously noted item has been adressed, final life fire safety inspection passed/complete.
FIRE-Final Inspection8/17/20178/17/20178/17/2017AFAIL
DetailsJim Page
Fire extinguisher needs to be added in area of work per note number 5 of the builing permit fire code review. Nearest fire extinguisher is located in elevator lobby area.
BLD-Final8/14/20178/14/20178/14/2017ADONE
DetailsRon Hill
BLD-Framing/Rough-in3/10/20173/13/20173/14/2017PPASS
DetailsDave Hannah
Bud Phone #: ###-####