Permit Information
Permit NumberBLD16-04552
StatusFinaled
Name KB FINANCIAL LLC
Site Address 2248 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberBLD16-04551 EPLAN
ePlanReview 
Description
(2 PERMITS TOTAL FILED UNDER BLD16-04551 IN EPLANREVIEW) DRH14-00164/PUD14-00006; WUI Zone A; Permit for the construction of a new 1904 sq. ft., two story (first story 786 sq. ft., second story 1118 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 121 sq. ft. of covered patio/porch and a 492 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1C zoning and setbacks per planning. //leg *** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20187/19/20187/19/2018APASS
DetailsTony Young
Ron Phone #: ###-####
DOC - Permit Finaled7/19/20187/19/20187/19/2018PPASS
DetailsTony Young
BLD-Final7/17/20187/18/20187/18/2018PDEFR
DetailsTony Young
Ron Phone #: ###-####
BLD-Final7/13/20187/13/20187/13/2018PNR
DetailsTony Young
Ron Phone #: ###-####,, needs fire caulking, seal attic access,, guard rail opening greater than 4"
BLD-Energy code compliance5/10/20185/11/20185/11/2018PPASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Framing/Rough-in5/8/20185/9/20185/9/2018APART
DetailsTony Young
Ron Phone #: ###-####,, see 2 paint marks,, nail hanger, strap top plate,, ok to insulate
BLD-Wall Bracing5/7/20185/9/20185/9/2018APASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Wall cover5/1/20185/1/20185/1/2018PPART
DetailsTony Young
Ron Phone #: ###-####,, soffits ok,, work in progress
BLD-Wall Bracing4/24/20184/25/20184/25/2018APASS
DetailsTony Young
Aaron- Phone #: ###-####
BLD-Framing/Rough-in4/16/20184/16/20184/16/2018PPART
DetailsJim Storey
Party wall - Aaron Phone #: ###-#### need horrazonal at rim infill and sole or top plare not nailled.
BLD-Other4/5/20184/6/20184/9/2018PPASS
DetailsTony Young
Aaron-fire wall Phone #: ###-####
BLD-Other3/29/20183/30/20183/30/2018APART
DetailsTony Young
Aaron-fire wall Phone #: ###-####,, work in progress 1st level,, ok so far,, ok to stand when ready
BLD-Foundation3/9/20183/9/20183/9/2018PPASS
DetailsBrandon Shaw
wall-Austin Phone #: ###-####
BLD-Foundation3/6/20183/6/20183/7/2018PPART
DetailsTony Young
Ron Phone #: ###-####,, footings ok,, work in progress