Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD17-00015
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameNorth Cytology Lab - St. Lukes
Customer Number 
ePlanReviewYes
Description
(NORTH CYTOLOGY REMODEL – 1ST STORY – ST. LUKE’S HOSPITAL – NORTH WING) The fire sprinkler system is used for high rise and for occupancy. To reconfigure and remodel a 1,374 square foot area containing the cytology lab to create better lab space and office space. The remodel area is located within a 5,310 square foot office and lab “tenant space”. The former 183 square foot Men’s locker/toilet room will be remodeled to create a new office and a smaller Men’s locker/toilet room accessible to the disabled. Work is to include interior nonbearing walls, relocated doors, new vinyl faced ceiling tiles, two medical exhaust hoods, hood exhaust systems, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/30/20185/31/20185/31/2018APASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Aging Inspection5/31/20185/31/20185/31/2018 PASS
DetailsDave Hannah
BLD-Aging Inspection5/30/20185/30/20185/30/2018 PEND
DetailsDave Hannah
FIRE-Final Inspection1/12/20181/16/20181/16/2018APASS
DetailsJim Page
Life fire safety inspection completed on 16NOV2017.
BLD-Final1/12/20181/16/20181/16/2018APASS
DetailsDave Hannah
Stan Phone #: ###-####
BLD-Final11/16/201711/17/201711/17/2017ANR
DetailsJim Sly
Stan Phone #: ###-####
Need 2 Mechanical finals......
FIRE-Final Inspection11/16/201711/16/201711/16/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work passed/complete.
BLD-Wall cover8/9/20178/10/20178/10/2017APART
DetailsBrandon Shaw
Phase I, fire caulk/seal all penetrations at fire/corridor wall. Phase II & III (all trades) work in progress