BLD-Conference | 3/13/2018 | 3/16/2018 | 3/16/2018 | A | DONE |
Tony Young
|
|
|
Inform permit holder to schedule required finals.
|
DOC - Permit Finaled | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Tony Young
|
|
|
done
|
FIRE-Final Inspection | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
|
BLD-Conference | 3/9/2018 | 3/12/2018 | 3/13/2018 | A | PEND |
Tony Young
|
|
|
Inform permit holder to schedule required finals.
|
BLD-Conference | 3/7/2018 | 3/9/2018 | 3/9/2018 | A | DEFR |
Tony Young
|
|
|
Inform permit holder to schedule required finals. out of time
|
BLD-Conference | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PEND |
Tony Young
|
|
|
Inform permit holder to schedule required finals.,, called Jon,, left a message
|
BLD-Conference | 1/16/2018 | 1/18/2018 | 1/18/2018 | A | PEND |
Tony Young
|
|
|
Check status of progress.,, needs a final fire life safety,, final letter ok ok from engineer,, and structural building final
|
BLD-Conference | 1/12/2018 | 1/16/2018 | 1/16/2018 | A | PEND |
Tony Young
|
|
|
Check status of progress.
|
BLD-Conference | 1/10/2018 | 1/11/2018 | 1/12/2018 | A | PEND |
Tony Young
|
|
|
Check status of progress.
|
BLD-Aging Inspection | 11/2/2017 | 11/2/2017 | 11/3/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Brandon Shaw
|
|
|
Dustin Phone #: ###-#### Two footings at Southeast wall. No further activity until early Fall.
|
BLD-Footing | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | PART |
Tony Young
|
|
|
Johathan Phone #: ###-####,, needs to finish rebar
|
BLD-Footing | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####, 2 post pad footings,, need to put rebar in
|
BLD-Conference | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PART |
Tony Young
|
|
|
Check status and construction schedule// talked with Jon King,, he said that the footing portions may be done in the month of May but the roof portion will done in late fall (Oct) when the business slows down to close the restaurant
|
BLD-Conference | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PEND |
Tony Young
|
|
|
John Phone #: ###-####,, ?s about existing footings,, would need structural engineer to accept as built and provide letter of ok
|