BLD-Final | 5/10/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez
|
DOC - Permit Finaled | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/8/2017 | 5/8/2017 | 5/8/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez . Provide code complianr handrail.
|
BLD-Energy code compliance | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez
|
BLD-Framing/Rough-in | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez
|
BLD-Framing/Rough-in | 3/30/2017 | 3/30/2017 | 3/30/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez . Brace the gable end upstairs , north side. Strap both sides of 15" glue lam beam to 6x6 post. Strap the 4x8 header to the (2) 2x4 below. Roll block floor joist at garage common wall and beyond entire length. Install OSB on garage common wall and fasten per shear wall schedule. Correction notice issued. Ok to insulate.
|
BLD-Wall Bracing | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | PASS |
Mike Jordan
|
|
|
Zane Phone #: ###-####
|
BLD-Foundation | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | DEFR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Concrete already placed when on site.
|
BLD-Footing | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|