BLD-Aging Inspection | 6/24/2020 | 6/24/2020 | 6/26/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT... Per planning and Zoning, range outlet has been covered and breaker has been pulled from electrical panel...
|
DOC - Permit Finaled | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 6/23/2020 | 6/23/2020 | 6/24/2020 | | PASS |
Tell Riley
|
|
|
WIP. project is almost complete, owners need zoning approval for ADU, apartment.
|
BLD-Final | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | NR |
Tell Riley
|
|
|
screened // Shawn Phone #: ###-####//need smoke detector dust covers removed//adjust springs hinges on garage man door//fire caulk penetrations at garage separation wall//waiting for response from zoning//
|
BLD-Final | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | NR |
Tell Riley
|
|
|
Shawn Phone #: ###-####//need to have plumbing permit and final//original permit is expired//let contact know to re-schedule//
|
BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 | | DONE |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 12/26/2019 | 12/26/2019 | 12/26/2019 | | DONE |
Tell Riley
|
|
|
Expires: 02/10/20
|
BLD - Request for Extension | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Tell Riley
|
|
|
Shawn-req to extend the expiration date. Phone #: ###-####//ok for extension//
|
BLD-Conference | 12/31/2018 | 12/31/2018 | 1/2/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 12/28/2018 | 12/28/2018 | 12/31/2018 | | CANC |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/13/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Jim Sly
|
|
|
Michelle Phone #: ###-####
|
BLD-Framing/Rough-in | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Sly
|
|
|
Michelle Phone #: ###-####-please call when on way Home owner said that metal stairway was existing and has not touched it.
|