BLD-Final | 8/3/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Mike Jordan
|
|
|
Please final fire life safety permit once the fire alarm permit is signed off (FIR17-00683). Contact Dominick Fery - ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps. Ok for perm occ.
|
FIRE-Final Inspection | 8/3/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Please final fire life safety permit once the fire alarm permit is signed off (FIR17-00683). Contact Dominick Fery - ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
BLD-Final | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PART |
Mike Jordan
|
|
|
Ross is the super. Last item to be reviewed is ceiling tile. Thank you! Phone #: ###-#### Inspection requested via web by Jackie Phelps. Ok for temp occ. while the remainder of the flooring and engineering room are completed.
|
FIRE-Final Inspection | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the Engineering Room is complete. The project related fire alarm permit will need to be finaled as well.
Ross is the super. Last item to be reviewed is ceiling tile. Thank you! Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
FIRE-Hydro test above ground | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
FIRE-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need all ceiling tile installed, Engineering Room complete (plan mod) and the project related fire alarm permit finaled. Per Ron Johnson a temporary will be ok when all of the ceiling tile has been installed
Ross is the super. Scheduling a final in the event our hardware and tile get done in time. We got approval to cover today. Also scheduled a conference to review as much as we can and then finish Monday if we have to. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
FIRE-Conference | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | PART |
Troy Cobbley
|
|
|
Fire life safety walk through - em lights, exit lights, egress lights, hardware and ceiling tile will be in progress for a final on Monday. Would like to get as much as we can looked at Friday and finish up Monday with the fire sprinkler contractor. (There is a chance we might achieve everything by Friday afternoon so will request a final as well) Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
BLD-Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | PEND |
Mike Jordan
|
|
|
Ross is the super, this inspection will be dependent on if fire Life Safety passes which is also scheduled for tomorrow. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
BLD-Ceiling Grid Inspection | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
Mike Jordan
|
|
|
Plumbing final (PLM17-03541) scheduled for AM on 7-12, if this passes, we would like approval to install all ceiling tile. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
FIRE-Final Inspection | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. Need the sub permits taken care of
Ross Phone #: ###-####
|
BLD-Wall cover | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | DONE |
Mike Jordan
|
|
|
Isaac Phone #: ###-####
|
BLD-Wall cover | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PART |
Mike Jordan
|
|
|
Ross Phone #: ###-####. Hardlids for restrooms ok, pending mech. and fire sprinkler.
|
BLD-Wall cover | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Mike Jordan
|
|
|
Ross Phone #: ###-####. Interior steel stud framed walls in engineering room ok.
|
BLD-Framing/Rough-in | 4/2/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Mike Jordan
|
|
|
Early afternoon please - Ross Phone #: ###-####. North wing classrooms ok for cover, except fot gathering room and engineering room. Also computer storage and computer work room at south wing ok.
|
BLD-Framing/Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Mike Jordan
|
|
|
Ross Phone #: ###-####. North corridor wall only ok.
|
BLD-Wall cover | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PART |
Jim Sly
|
|
|
Ross Phone #: ###-#### Select walls as marked and initialed on thier condensed plan. Mainly South 1/2 of bldg.
|
BLD-Wall Bracing | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | FAIL |
Mike Jordan
|
|
|
shear-Ross Phone #: ###-####. INterior shear walls., missing screws or screws did not attach to studs or strapping.
|
BLD-Wall Bracing | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Mike Jordan
|
|
|
Ross Phone #: ###-####. Exterior shear walls (north,south and east walls) ok.
|
BLD-Framing/Rough-in | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Jim Storey
|
|
|
Ross-roof sheathing Phone #: ###-####balance of deck ok to cove noted on plan
|
BLD-Wall Bracing | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Mike Jordan
|
|
|
Ross Phone #: ###-####. Roof nailing and straps at north east wing and north wing from grids 6.5 to 10.
|
BLD-Framing/Rough-in | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | PART |
Mike Jordan
|
|
|
Roof sheathing & exterior walls - Ross Phone #: ###-####. Work in progress on nailing and installin straps at north east portion of building. Will recall when completed.
|
BLD-Other | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PART |
Jim Sly
|
|
|
Roof nailing- Ross Phone #: ###-#### Roof deck nailing 6/12.....OK at South wing......West 1/2f.
|
BLD-Framing/Rough-in | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PART |
Jim Sly
|
|
|
Ross Phone #: ###-#### Roof blocking...strapping OK West 1/2 of South wing
|
BLD-Other | 12/6/2017 | 12/6/2017 | 12/7/2017 | P | PART |
Dave Hannah
|
|
|
roof sheathing // North wing classrooms // Ross Phone #: ###-#### see plans for area signed off
|
BLD-Framing/Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Mike Jordan
|
|
|
Ross Phone #: ###-####. Remainder of exterior steel stud framed walls. Ok to install OSB sheeting.
|
BLD-Framing/Rough-in | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Mike Jordan
|
|
|
After 3pm please- Ross Phone #: ###-####. Exterior steel stud framed walls from grids 7 to 10 on grid A. grids a to D on grid 10.
|
BLD-Other | 10/18/2017 | 10/23/2017 | 10/23/2017 | A | PART |
Mike Jordan
|
|
|
floor placement // Ross Phone #: ###-####. Welded wire mesh for slab on grade, west half of building. Will install concrete dobi's prior to placement. Will have specil inspection.
|
BLD-Footing | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Mike Jordan
|
|
|
Ross-interior footings-pour time 9:00 Phone #: ###-####. Remainder of interior footings ok. Will have special inspection.
|
BLD-Foundation | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | PART |
Mike Jordan
|
|
|
Ross-interior footings Phone #: ###-####-pour time 2:00. Interior footings for corridors. Noted no city approved plans on site.
|
BLD-Conference | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | CANC |
Mike Jordan
|
|
|
Moved to pm for framing inspection of arch to tennis courts.
|