BLD-Conference | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Mike Jordan
|
|
|
Inspection requested via web by Asim Smajlovic
|
DOC - Permit Finaled | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Mike Jordan
|
|
|
Smoke detectors have been repaired.
|
BLD-Conference | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | NR |
Mike Jordan
|
|
|
Inspection requested via web by Asim Smajlovic
|
BLD-Conference | 9/3/2018 | 9/4/2018 | 9/4/2018 | A | FAIL |
Mike Jordan
|
|
|
call-###-#### emina Inspection requested via web by Asim Smajlovic. The smoke/carbon monoxide detector is not functioning.
|
BLD-Aging Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | | PASS |
Mike Jordan
|
|
|
Working on Mech. final.
|
BLD-Final | 7/1/2018 | 7/2/2018 | 7/2/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Asim Smajlovic. Mech. final has failed.
|
BLD-Conference | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | CANC |
Mike Jordan
|
|
|
Inspection requested via web by Asim Smajlovic
|
BLD-Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | NR |
Mike Jordan
|
|
|
Asim Phone #: ###-####. Needs electrical and mech fianls first. Tried to call to notify, but appears there phone is not working?
|
BLD-Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Brandon Shaw
|
|
|
Framing for addition appears to be satisfactor, insulation and foam seal done. Patio cover framing sat. OK to cover
|
BLD-Framing/Rough-in | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | CANC |
Mike Jordan
|
|
|
Idat Phone #: ###-####
|
BLD-Wall Bracing | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Mike Jordan
|
|
|
Idat Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | CANC |
Mike Jordan
|
|
|
Call if any issues // Idat Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | NR |
Mike Jordan
|
|
|
Idat (call if any problems) Phone #: ###-####. Needs MEP's rough in and inspections first.
|
BLD-Wall Bracing | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | FAIL |
Mike Jordan
|
|
|
Idat (call if any problems) Phone #: ###-####. Provide blocking and nail exterior sheathing to blocking.
|
BLD-Footing | 5/5/2017 | 5/9/2017 | 5/9/2017 | A | PART |
Mike Jordan
|
|
|
Dustin Phone #: ###-####. Mono placement ok.
|