BLD-Conference | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | PART |
Jim Storey
|
|
|
Status?//Rough-in 5/9/2020 5/11/2020 5/11/2020 A PART
DetailsJack Reynolds 1st phase new part two last units on main floor and 12 units on the 3rd floor(floor above) Phone #: ###-#### Inspection requested via web by yuriy kryachun - units 240,241 exhaust duct R/I ok - unit 330- 341 exhaust duct R/I ok - ok for first layer sheetrock and fire caulk
|
BLD-Framing/Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Jim Storey
|
|
|
Roman Phone #: 208-###-#### first floor rooms and lobby ok to cover
|
BLD-Other | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Jim Storey
|
|
|
Roman-wants and ok to cover pantry meeting room Phone #: ###-####
|
BLD-Other | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Jim Storey
|
|
|
Fire rating exhaust shaft - Roman Phone #: ###-#### 4th floor west building ok
|
BLD-Conference | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PEND |
Bob Archibald
|
|
|
Conference on mechanical bath fan requirements in both old and new construction areas. Old or original building bath areas require 5/8 sheetrock above fan and minimum 26 gage duct to center wall. New building bath areas require removal of fan units in shaft and relocation into a drop down soffit and 26 gage duct from fan to shaft. Both areas shall have fire dampered fans.
|
BLD-Other | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PEND |
Dave Hannah
|
|
|
Roman-fire wall-from shower to hallway-when you get there ask for Sergy to show you where inspection is needed Phone #: ###-#### looked at concrete board on shower wall looks ok but need to see paper work for listing
|
BLD-Framing/Rough-in | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Jim Storey
|
|
|
Romeo ###-#### Spoke with Bob and he said framing in the rooms, not bathrooms, is ok. wall pach and wall finshes ok/doors to be replaced thu rout building. corridor wall and shaft on hold until feb.
|
BLD-Conference | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PEND |
Jim Storey
|
|
|
SWO issued. No cover of exposed framing without inspector approval ( walls, floor/ceilings and shafts). Rated/labeled door and frame assemblies required in corridoor on west 1/2 of building past 2hr rated wall corridoor. Architect also reviewed site and existing conditions at SWO issuance. Majority of violations were observed on 4th floor as 2nd and 3rd floors are occupied. Verification of corridoor wall construction on 2nd and 3rd floor at showers will be required.
|
BLD-Conference | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PEND |
Jim Storey
|
|
|
Site review with plum/mec and electrical supervisors. Mec has issued a SWO on mechanical fan installations. Cooridors and fire rated construction of walls, floor/ceilings and shafts have been compromised. Will recommend to BO that no occupancy should be allowed untill fire rated provisions have been corrected.
|